GDF SUEZ will not be in the position to transfer 32 GWh/d on the Dunkirk entry point of the GRTgaz network as of 1 October 2010 and until 30 September 2026. In accordance with the commitments offered to the European Commission, GDF SUEZ will transfer an additionnal batch of 1 GM3 / year on the Montoir de Bretagne LNG terminal as of 1 October 2011 and until 31 December 2035. This second batch will be traded by Elengy simultaneously with the one transferred on the same terminal as of 1 October 2010 and until 31 December 2035 in the framework of the procedure presented by Elengy to the CRE.